Add senior engineers

QA and testing

Automated coverage and release gates, on your codebase or on ours. Enough tests to release without a war room, rather than a coverage number for its own sake.

Discuss this work

When to bring us in

If more than one of these is true, the engagement usually pays for itself in the first quarter.

  1. 01

    Every release needs a manual checklist and three people watching.

  2. 02

    The same bug has come back twice.

  3. 03

    A test suite exists and is routinely skipped because it is flaky.

  4. 04

    Performance problems appear in production and cannot be reproduced.

What the engagement includes

  • Test strategy

    What gets automated, what stays manual, and the reasoning for each.

  • Automation

    Suites on the critical paths first, written to be readable by your engineers.

  • Regression

    A suite that runs on every change and is trusted enough to block a release.

  • Release gates

    Criteria agreed with you and enforced in the pipeline, not in a meeting.

  • Performance

    Load profiles based on real traffic, with thresholds that mean something.

  • Reporting

    Failures that point to a cause rather than to a screenshot.

Related practices

Speak to an engineer, not a salesperson.

Book a 45 minute technical assessment in your timezone, or send the details and we reply within one business day.